PS6C1390-2.jpg

Bridgend , Wales

GETTING EVERYONE BUILDING - NOTTAGE PRIMARY SCHOOL

 

Project Partners: Nottage Primary School, Arts Council Wales, Phil Lambert

Project Brief: The architecture profession and wider construction industry are currently highly inaccessible to large areas of the modern demographic. Children don’t get a say in the world around them, as the end users they should be allowed ownership over the space they use. Having their input could greatly improve satisfaction and therefore areas of learning.

By working with primary and secondary schools, interacting with students at an early age through design workshops and on site sessions, we can offer a view into the world of design, architecture and construction. With a specific focus on BAME and low income background groups, these workshops (tailored to the school’s needs) engage all students and show the many opportunities for future careers in the creative industries.

Through interactive talks, drawing + modelling sessions, measuring + mathematical surveying, the students get an increased understanding of the different routes into a construction and creative practice. Working from design concept through to hands on sessions with all levels including hard to reach kinaesthetic learners.

Our Services: Brief development, Concept Design, Developed Design, Technical Design, Construction, Educational Workshop Delivery.

 
 
 
PS6C1418-2 (1).jpg
PS6C1573-3 (2).jpg
PS6C1347.jpg
PS6C1497.jpg
 
PS6C1602-2.jpg
 
PS6C0048-2.jpg
 

Through a series of workshop sessions, with 60 year 3 pupils, we explored creative, collaborative learning. Using the design and construction process as a vehicle, this project allowed the pupils to work through elements of teamwork, creative thinking, analysing and presenting through self-led learning. Providing 10 workshop sessions that have open-ended briefs to push the pupils to explore any given idea they may have. The workshop sessions were intended to lead towards a final built outcome. With free-reign to find the site they preferred within the school, come up with ideas around what they could build the pupils took ownership of the space they were designing.

After 10 sessions surrounding site analysis, brief formulation, concept design, model making, developed design and group presentations we came to a final design. This took into consideration the 7 different team’s ideas and through presentations the other pupils we extracted the best bits from each. We took these ideas and developed the final, buildable design.

This was then presented back to the students to receive their final feedback and make sure all were happy and felt represented. Following the final site preparations and H&S inductions, we were ready for site!

We were on site for 8 full days, of which the pupils worked for 5 days alongside our team. The children were involved in the setting out, digging of foundations, levelling of footings, marking, measuring and cutting timber and much more!

The structure itself is an open air, timber frame, outdoor classroom. There is a main decked area below for small groups of learners or even to be used as a performance stage. Above is a mezzanine floor for the pupils to enjoy a sense of height and the views out to the sea- ideas which came from the pupil’s desire for a castle. Clad in painted plywood, giving some popping colour to the playground and sheltered with clear polycarbonate allows views to the sky and stars above.

Special elements of the pupil’s ideas were combined and integrated to create the final design. The key ideas incorporated a tent, a castle tower, wind sculpture and giant high five hand!

 
 
PS6C1574.jpg
 
PS6C1636 (1).jpg
 
PS6C9958 (1).jpg
 
 
PS6C1393.jpg